Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manual第1張

Double wall corrugated pipe construction manual第2張

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: 国产尤物av尤物在线看| 国产免费看插插插视频| 国产精品18久久久| 亚洲欧美成人久久综合中文网| 国产色精品久久人妻| 久久av老司机精品网站导航| 绝顶丰满少妇av无码| 欧洲熟妇色 欧美| 久久人妻精品国产| 97久久精品人人澡人人爽| 芙宁娜被??黄漫扒衣服| 国产精品导航一区二区| 国产亚洲精品第一综合麻豆| 久久国产精品国产四虎90后| 18禁黄网站禁片免费观看女女| 国产精品无码成人午夜电影| 日韩激情无码免费毛片| 少妇饥渴偷公乱av在线观看涩爱 | 日本一二三区视频在线 | 无码人妻久久一区二区三区蜜桃| 亚洲午夜成人精品电影在线观看| 无码办公室丝袜ol中文字幕| 在线综合亚洲欧美网站| 国产免费久久精品99re丫丫| 2023国产精品一卡2卡三卡4卡| 韩国午夜理论在线观看| 视频分类 国内精品| 无码激情亚洲一区| 国产精品_国产精品_k频道w| 国产爆乳成av人在线播放| 日本欧美大码aⅴ在线播放| 怡春院国产精品视频| 免费高清av一区二区三区| 免费国产在线精品一区| 亚洲日韩看片无码超清| 精品国产中文字幕在线视频| 欧美成人片一区二区三区| 粉嫩av久久一区二区三区| 亚洲精品tv久久久久久久久j | 亚洲五月天综合| 国产免费无码av在线观看|