日韩hdI久操天堂I久草在线费播放视频I依人做aI强开小受嫩苞第一次免费视频I鲁一鲁在线I亚洲淫小说AV在线I绿帽 无套 91 九色 论坛I大香焦超碰I国产96视频I久久免费的精品国产v∧I五月天婷婷综合I可以免费看av的网站I欧洲精品码一区二区三区免费看I日本二三四区I日韩黄色一级电影I99爱精品视频在线观看I特级西西www44高清大胆图片

Double wall corrugated pipe construction manual

2025-03-19

Construction points of double-wall corrugated pipe

1. Excavation of trenches.

The net width of the bottom of the trench is generally determined according to the diameter of the pipe. When the diameter is greater than 450mm, the net width of each side of the pipe should not be less than 500mm. When the diameter is less than 450mm, the net width of each side should not be less than 300mm. In order to avoid the bottom of the groove being soaked in water, drainage measures must be taken before opening. If manual drainage is used, it can be excavated when the water level drops below the bottom of the groove.

Second, laying a cushion. Double-wall corrugated pipe construction contact, Hubei double-wall corrugated pipe

before the installation of the pipeline, the need to lay a cushion, the thickness should also meet the design requirements, for better soil foundation, the bottom of the groove laying a layer of medium coarse sand cushion can be, the thickness is generally 10mm; for poor soil foundation, you can use layered laying, the upper layer using medium coarse sand, the thickness should be greater than 50mm, the lower layer using a thickness of 100mm-150mm crushed stone.

III. Installation and connection. Double-wall corrugated pipe construction contact Hubei double-wall corrugated pipe manufacturer, Hubei AD Building Materials Co., Ltd.

HDPE double-wall corrugated pipe should be strictly inspected before laying the lower pipe. Pipes that do not meet the standards should be strictly prohibited from running down the pipe. The nozzles at the end of the pipe are divided into sockets and sockets. The sockets should be installed in the direction of water flow, and the sockets should be installed in the direction of countercurrent flow. When interfacing, first clean up the inner wall of the nozzle, and then apply silicone oil and other lubricants on the socket and socket rubber ring, and finally keep the central axis of the nozzle aligned. Double-wall corrugated pipe, wuhan pe double-wall corrugated pipe manufacturer.

Fourth, masonry inspection well

The bottom foundation of the well should be poured at the same time as the bottom foundation of the pipe; generally, the circular inspection well adopts the method of wall masonry, small inner seam and large outer seam to plug broken bricks into the outer ash seam to reduce the amount of mortar. The vertical ash joints of the upper and lower skin of each layer of bricks should be staggered; finally, the connection between the pipeline and the inspection well should be based on a flexible foundation, which is also different from traditional pipelines.

Five, closed water test

Double wall corrugated pipe construction manualthe1page

Double wall corrugated pipe construction manualthe2page

double-wall corrugated pipe construction contact, Hubei AD Building Materials Co., Ltd. is at your service, AD brand double-wall corrugated pipe, Jingjie double-wall corrugated pipe, Wuhan corrugated pipe, Hubei double-wall corrugated pipe manufacturer


主站蜘蛛池模板: gv天堂gv无码男同在线观看| 欧美性猛交xxxx乱大交丰满| 亚洲最新无码成av人| 97久久超碰成人精品网站| 极品国产主播粉嫩在线观看| 色播在线精品一区二区三区四区| 熟妇人妻系列av无码一区二区| 九色porny丨国产首页注册| 欧美成人免费全部| 国产一区二区不卡在线看| 亚洲综合小说专区图片| 亚洲人成色77777在线观看大战p | 免费不卡无码av在线观看| 亚洲国产成人a精品不卡在线| 日日摸夜夜添狠狠添欧美| 亚洲欧美乱日韩乱国产| 中文无码热在线视频| 国产综合精品久久丫| 人人做人人爽国产视| 亚洲欧美日韩中文字幕一区二区三区| 黑人巨大av无码专区| 国产精品成人永久在线四虎| 亚洲中文字幕无码一区| 无码人妻精品一区二区三区下载 | 500av导航大全精品| 婷婷五月综合缴情在线视频| 天干天干夜啦天干天干国产| 日韩精品一区国产偷窥在线| 久久九九兔免费精品6| 国产人妇三级视频在线观看 | 十八禁无码免费网站| 国产精品午夜福利麻豆| 一区二区伊人久久大杳蕉| 激情五月开心综合亚洲| 国产精品熟妇一区二区三区四区 | h漫全彩纯肉无码网站| 大屁股人妻女教师撅着屁股| 亚洲国产欧美中文丝袜日韩| 久久成人网站亚洲综合| 米奇欧美777四色影视在线 | 中国杭州少妇xxxx做受|