色婷婷五月综合亚洲小说-国产精品久aaaaa片-在线亚洲97se亚洲综合在线-欧美三级午夜理伦三级-亚洲超清无码制服丝袜无广告

Construction process of pre-buried and reserved PVC drainage pipeline in AD (2)

2025-03-21

Hubei Au Yuan Building Materials Co., Ltd. Detailed explanation of the construction process of Au Yuan PVC drainage pipeline 1. Drain pipe hole reservation (1) Construction process Reserved hole mold making Civil formwork inspection Handover drainage pipe installation positioning scribing reserved hole mold installation quality inspection and acceptance (rectification) Concrete pouring (inspection and protection) Reserved hole mold removal Drainage pipe installation Reserved hole plugging (2) Production of reserved hole mold 1. Mold selection and specifications: Reserved hole mold is made of steel pipe, according to the design drain pipe specifications, according to its 1.4 - 1.7 times the size of the steel pipe. 2. Mold processing: Use a cutting machine to intercept the steel pipe with the same thickness as the cast-in-place plate in three small rooms, and cut a triangle of about 1cm on the side wall of the steel pipe to create a steel casing with a large upper mouth and a small lower mouth to embed the mold, which is convenient for subsequent mold removal. After that, the punched fixed iron sheet is welded to the steel pipe for fixing and sealing. 3. Surface treatment: Grind the weld joint to make it smooth, then apply a mold release agent to the inner and outer walls of the mold, and use it for backup after completion. 4. Top cover template production: According to the specifications of the reserved hole mold, use a waste coated plate to saw the top cover template, and punch a fixed hole to fix it with the mold. 5. Preliminary process connection: check the handover of the civil formwork and the installation of the drainage pipe positioning and marking steps, which are consistent with the operation of the pre-embedding process. (3) Reserved hole mold installation 1. Mold fixing and sealing: place the reserved hole mold on the painted point, and use screws to firmly fix it with the formwork through the fixed hole of the mold. Check the gap between the mold and the formwork to ensure that it is tight and seamless, and then tighten the cover plate of the film-covered plate on the top of the mold with screws to prevent concrete from being poured into the mold.

2. Quality inspection and acceptance: After the reserved hole mold is installed and the civil steel reinforcement is bound, carry out the quality inspection of the reserved hole mold. Focus on checking whether the diameter of the reserved hole meets the requirements, whether the position is accurate and how firm the fixing is. 3. Mold removal: When the strength of the concrete reaches the condition that it can be used, the mold removal operation can be carried out. First loosen the screws of the top cover, remove the top cover, and then gently tap the inside of the reserved hole mold with a hand hammer, and tap a circle around the inner side wall. After the loosening between the concrete and the mold, the mold can be taken out. After taking it out, clean the mold and apply the mold release agent again. At the same time, clean up the garbage generated during the operation, and store the mold and accessories to the designated location for the next use. 4. Reserved hole plugging: Before the pipeline is installed, the periphery of the reserved hole needs to be chiseled. After the pipeline is installed and inspected qualified, rinse the periphery of the hole and the periphery of the bottom. The bottom of the hole is blocked by a special hanging mold (or a coated plate with a thickness of not less than 15mm), and the two formwork are joined and butted together. After docking, the total size is three times the pipe diameter, and the lower part is tightly fixed with a clamp. After the formwork is plugged, water the concrete at the joints around the reserved hole in time. When the surface of the concrete on the joint is clear water, brush the cement slurry on the surface. After the cement slurry is brushed, pour the sealed hole concrete in time. The slump of the concrete should be controlled at about 150mm, and the concrete pouring height should be 1/2-2/3 of the plate thickness. The next day, apply a layer of plugging spirit around the hole and the surface of the poured concrete. After the plugging spirit solidifies, carry out an irrigation test to check whether the periphery of the hole is leaking. After 24-hour test without leakage, the concrete on the upper part of the hole was poured into the cast-in-place slab again.

Construction process of pre-buried and reserved PVC drainage pipeline in AD (2)第1張

主站蜘蛛池模板: 久久caoporn国产免费| 精品国产污污免费网站| 欧美性猛交xxxxx按摩欧美| 男女无遮挡xx00动态图120秒| 粗大的内捧猛烈进出看视频 | 爱色精品视频一区二区| 午夜无码一区二区三区在线观看| 高潮毛片无遮挡高清视频播放| 精品视频国产香人视频| 欧美日韩在线视频| 亚洲内射少妇av影院| 国产亚洲精品久久久一区| 亚洲电影区图片区小说区| 国产精品色内内在线播放| 国产精品99久久精品| 狠狠躁夜夜躁人人躁婷婷视频 | 亚洲精品久久久久中文字幕m男| 亚洲综合精品伊人久久| 国产女人18毛片水真多| 国产精品无码一区二区牛牛| 女人被狂躁的高潮免费视频| 国产福利酱国产一区二区| 国产精品久久久久久久久久免费看 | 2020国产成人精品视频| 一个添下面两个吃奶把腿扒开| 久久九九51精品国产免费看| 久久国内精品一区二区三区| 久久伊人色av天堂九九小黄鸭| 国产东北露脸熟妇| 人妻av无码系列专区移动可看| 成人无码嫩草影院| 久久综合九色综合欧美就去吻| 国产内射999视频一区| 麻豆av福利av久久av| 色哟哟网站在线观看| 狼人大香伊蕉在人线国产| 无码男男作爱g片在线观看| 特黄特色大片免费播放| 国产精品原创巨作av女教师| 亚洲伊人色综合www962| 少妇粉嫩小泬喷水视频www|