日韩hdI久操天堂I久草在线费播放视频I依人做aI强开小受嫩苞第一次免费视频I鲁一鲁在线I亚洲淫小说AV在线I绿帽 无套 91 九色 论坛I大香焦超碰I国产96视频I久久免费的精品国产v∧I五月天婷婷综合I可以免费看av的网站I欧洲精品码一区二区三区免费看I日本二三四区I日韩黄色一级电影I99爱精品视频在线观看I特级西西www44高清大胆图片

Construction process of pre-buried and reserved PVC drainage pipeline in AD (2)

2025-03-21

Hubei Au Yuan Building Materials Co., Ltd. Detailed explanation of the construction process of Au Yuan PVC drainage pipeline 1. Drain pipe hole reservation (1) Construction process Reserved hole mold making Civil formwork inspection Handover drainage pipe installation positioning scribing reserved hole mold installation quality inspection and acceptance (rectification) Concrete pouring (inspection and protection) Reserved hole mold removal Drainage pipe installation Reserved hole plugging (2) Production of reserved hole mold 1. Mold selection and specifications: Reserved hole mold is made of steel pipe, according to the design drain pipe specifications, according to its 1.4 - 1.7 times the size of the steel pipe. 2. Mold processing: Use a cutting machine to intercept the steel pipe with the same thickness as the cast-in-place plate in three small rooms, and cut a triangle of about 1cm on the side wall of the steel pipe to create a steel casing with a large upper mouth and a small lower mouth to embed the mold, which is convenient for subsequent mold removal. After that, the punched fixed iron sheet is welded to the steel pipe for fixing and sealing. 3. Surface treatment: Grind the weld joint to make it smooth, then apply a mold release agent to the inner and outer walls of the mold, and use it for backup after completion. 4. Top cover template production: According to the specifications of the reserved hole mold, use a waste coated plate to saw the top cover template, and punch a fixed hole to fix it with the mold. 5. Preliminary process connection: check the handover of the civil formwork and the installation of the drainage pipe positioning and marking steps, which are consistent with the operation of the pre-embedding process. (3) Reserved hole mold installation 1. Mold fixing and sealing: place the reserved hole mold on the painted point, and use screws to firmly fix it with the formwork through the fixed hole of the mold. Check the gap between the mold and the formwork to ensure that it is tight and seamless, and then tighten the cover plate of the film-covered plate on the top of the mold with screws to prevent concrete from being poured into the mold.

2. Quality inspection and acceptance: After the reserved hole mold is installed and the civil steel reinforcement is bound, carry out the quality inspection of the reserved hole mold. Focus on checking whether the diameter of the reserved hole meets the requirements, whether the position is accurate and how firm the fixing is. 3. Mold removal: When the strength of the concrete reaches the condition that it can be used, the mold removal operation can be carried out. First loosen the screws of the top cover, remove the top cover, and then gently tap the inside of the reserved hole mold with a hand hammer, and tap a circle around the inner side wall. After the loosening between the concrete and the mold, the mold can be taken out. After taking it out, clean the mold and apply the mold release agent again. At the same time, clean up the garbage generated during the operation, and store the mold and accessories to the designated location for the next use. 4. Reserved hole plugging: Before the pipeline is installed, the periphery of the reserved hole needs to be chiseled. After the pipeline is installed and inspected qualified, rinse the periphery of the hole and the periphery of the bottom. The bottom of the hole is blocked by a special hanging mold (or a coated plate with a thickness of not less than 15mm), and the two formwork are joined and butted together. After docking, the total size is three times the pipe diameter, and the lower part is tightly fixed with a clamp. After the formwork is plugged, water the concrete at the joints around the reserved hole in time. When the surface of the concrete on the joint is clear water, brush the cement slurry on the surface. After the cement slurry is brushed, pour the sealed hole concrete in time. The slump of the concrete should be controlled at about 150mm, and the concrete pouring height should be 1/2-2/3 of the plate thickness. The next day, apply a layer of plugging spirit around the hole and the surface of the poured concrete. After the plugging spirit solidifies, carry out an irrigation test to check whether the periphery of the hole is leaking. After 24-hour test without leakage, the concrete on the upper part of the hole was poured into the cast-in-place slab again.

Construction process of pre-buried and reserved PVC drainage pipeline in AD (2)the1page

主站蜘蛛池模板: www国产精品内射老师| 免费精品人在线二线三线区别| 色五月丁香五月综合五月| 久久人人妻人人做人人爽| 国产精品偷伦视频免费观看了 | 无码精品人妻一区二区三区av| 亚洲v欧美v国产v在线观看| 女人裸体做爰免费视频| 欧美亚洲国产第一精品久久| 人妻丰满熟妇av无码处处不卡| 夜鲁鲁鲁夜夜综合视频欧美| 制服 丝袜 人妻 专区一本| 亚洲成色在线综合网站免费| 无码av岛国片在线播放| 5858s亚洲色大成网站www| 免费人成在线观看网站品爱网| 无码高潮少妇毛多水多水| 无码任你躁久久久久久老妇蜜桃| 亚洲综合色婷婷六月丁香宅男大增| 中文人妻av久久人妻水蜜桃| 日本免费精品一区二区三区| 人人妻人人澡人人爽欧美一区双| 国产成人欧美亚洲日韩电影| 少妇性饥渴无码a区免费| 最新亚洲伦理中文字幕| 国产欧美另类久久久精品丝瓜| 精品一区二区三区在线视频| 日韩大陆欧美高清视频区| 日韩无码网站| 成人国产片视频在线观看| 9420免费高清在线观看视频| 久久久毛片| 日韩人妻中文无码一区二区三区| 久久国产精品亚洲艾草网| 婷婷色中文字幕综合在线| 国产做爰xxxⅹ久久久| 欧美黑人又粗又硬xxxxx喷水| 欧美日韓性视頻在線| 精品人妻久久久久久888| 成人国产mv免费视频| 真人作爱90分钟免费看视频|