日韩hdI久操天堂I久草在线费播放视频I依人做aI强开小受嫩苞第一次免费视频I鲁一鲁在线I亚洲淫小说AV在线I绿帽 无套 91 九色 论坛I大香焦超碰I国产96视频I久久免费的精品国产v∧I五月天婷婷综合I可以免费看av的网站I欧洲精品码一区二区三区免费看I日本二三四区I日韩黄色一级电影I99爱精品视频在线观看I特级西西www44高清大胆图片

Construction process of HDPE steel mesh skeleton composite pipe

2025-03-19

Construction process of HDPE steel mesh skeleton composite pipethe1page

1. Construction steps and precautions

Step 1: Power supply, welding machine selection

Power cord should be selected within 100 meters 6 square millimeters, before welding, you need to choose the appropriate welding voltage according to the identification parameters on the pipe fittings, there are two kinds of voltages of 220 volts and 380 volts, be sure to check clearly before use

Step 2: Blanking

Cut the pipe according to the required length to ensure that the port is perpendicular to the pipe axis

Step 3: Section grinding

After the pipe is cut, it needs to be polished by an angle grinder to make the section flat, which is conducive to improving the sealing quality

Step 4: Seal

Use a hot air welding torch or a plastic extrusion welding machine and a PE electrode to seal the cutting surface of the steel wire and rubber layer, and must cover all the exposed steel wire. Note: Hot air welding torch To face the cutting surface and the electrode at the same time heating,

Step 5: Mark number

mark the depth of the pipe socket on the pipe to ensure that the pipe socket is in place

Step 6: remove the oxide layer, clean the welding area

use hanging to remove the pipe end oxide layer, and wipe the surface of the welding area with a clean towel. The welding surface is not allowed to have mud, oil and other dirt. Note: If there is oil at the end, use alcohol solution to deal with it.

Step 7: Socket connection

When the socket is inserted, first set the pipe on one end of the pipe. When it is slightly tight, use a rubber hammer to gently tap, and the other end is padded with wood. Use a hammer to hit or hand-cranked gourd to assist the socket in place.

Note: When the socket is inserted, a round object can be padded under the pipe for easy installation. When the large-diameter pipe is installed tightly, it can be installed with a tensioner. Special attention should be paid to ensure the cleanliness of the installation surface during Before welding, the pipe should be padded with a support.

note that in order to prevent the pipe fittings and pipes from falling during welding, the pipe fittings or pipes should be supported with wooden blocks before welding.

Step 9: Electrofusion Welding

Operation Steps:

Select the appropriate welder according to the pipe diameter specification. When the pipe specification is less than or equal to 300 millimeters, the output voltage of the welder should be 200 volts. When the pipe specification is greater than 300 millimeters, the output voltage of the welder should be 300 volts. According to the diameter of the terminal latch on the pipe fittings, choose the corresponding fused joint. Insert the cable into the welding machine to turn on the power supply, turn on the machine power switch, and enter the parameter interface. According to the pipe fitting parameters, set the corresponding parameters on the equipment through the up and down cursor. Then insert the two electric fusion joints into the terminal block of the pipe fitting respectively, and press the OK button to start welding. Tenth step: cooling

after the welding is completed, the cooling process to let the welding in a natural state, and should ensure that the cooling process is not subject to any external force, after cooling to move

Hubei AD Building Materials Co., Ltd. Reminder, the welding process precautions:

1, if the voltage is unstable, stop welding immediately,

2, if the welding process power failure, not allowed to secondary welding,

3, before welding according to the pipe logo, accurate input welding parameters

4, pipe in the cooling down prohibit movement, bending, to avoid pipe and pipe separation or leakage phenomenon,

5, rain and snow weather welding, when the temperature is lower than minus ten degrees Celsius welding is prohibited.

Second, pressure test acceptance

1, pressure test acceptance can refer to the water supply steel mesh skeleton plastic composite pipeline engineering technical regulations, and buried plastic water supply pipeline engineering technical regulations.

2, the pipeline can be backfilled after passing the pressure test.

If there is a steel mesh skeleton pipeline contact hotline 17399989993, Hubei AD Building Materials Co., Ltd. sells AD pe pipe, AD pe steel mesh skeleton composite pipe.


主站蜘蛛池模板: 亚洲精品中文字幕乱码| 精品99日产一卡2卡三卡4 | 日本少妇春药特殊按摩3| 久久精品人妻无码一区二区三区v| 乱亲女h秽乱长久久久| 亚洲欧美日韩视频高清专区| 亚洲成av人片在一线观看| 亚洲人成伊人成综合网小说| 国精产品一品二品国在线| 国产无码AV| 琪琪女色窝窝777777| 国产亚洲精久久久久久无码苍井空| 色欲色香天天天综合无码| 国产精品麻豆欧美日韩ww| 99re66久久在热青草| 亚洲日韩国产av无码无码精品| 国产亚洲午夜高清国产拍精品| 日日噜噜夜夜爽爽| 亚洲精品国产精品制服丝袜| 亚洲男女一区二区三区| 熟妇无码乱子成人精品| 亚洲第一区欧美国产综合| 国产人妇三级视频在线观看| 又大又硬又爽免费视频| 一二三四在线视频社区3| 无线乱码一二三区免费看| 国产乱妇乱子视频在播放| 在线无码视频观看草草视频| 无码三级国产三级在线电影| 无码少妇丰满熟妇一区二区| 久久精品www人人爽人人| 97久久综合亚洲色hezyo| 亚洲第一区欧美国产综合86| 国产人妻精品区一区二区三区| 亚洲熟女乱综合一区二区| 无码午夜人妻一区二区三区不卡视频| 久久无码人妻一区二区三区| 欧美激情一区二区三区成人| 久久精品无码鲁网中文电影| 成人精品视频99在线观看免费| 成人性能视频在线|