色婷婷五月综合亚洲小说-国产精品久aaaaa片-在线亚洲97se亚洲综合在线-欧美三级午夜理伦三级-亚洲超清无码制服丝袜无广告

PE pipe acceptance, storage, handling and transportation, raw materials and connection technology

2025-03-21

PE pipe acceptance, storage, handling and transportation, raw materials and connection technology第1張

1, General Provisions

① Pipes and fittings shall have the product quality inspection report of the quality inspection department and the certificate of conformity of the manufacturer.

② When storing, handling and transporting pipes, non-metallic ropes shall be used for bundling, and the ends of pipes shall be blocked.

③ When storing, handling and transporting pipes and fittings, they shall not be thrown and cracked.

④ When storing, handling and transporting pipes and fittings, they shall not be exposed to the sun and rain; they shall not be in contact with other chemical substances such as oil, acid and salt.

⑤ The storage period of pipes and fittings from production to use shall not exceed one year.

2, Material Acceptance

① Receiving pipes and fittings must be accepted. First accept the product instruction manual, product certificate, quality assurance and various performance inspection and acceptance reports and other relevant materials.

② When accepting pipes and pipe fittings, samples should be taken in the same batch, and according to the current national standard "Water supply (PE) polyethylene material" for specification size and appearance performance inspection, and comprehensive testing should be carried out when necessary.

3, storage

① Pipes and pipe fittings should be stored in a well-ventilated warehouse or a simple shed with a temperature not exceeding 40 ° C.

② Pipes should be stacked horizontally on a flat support or on the ground. The height of stacking should not exceed 1.5 meters. When the pipes are bundled into 1m x 1m square bundles and supported on both sides for protection, the stacking height can be appropriately increased, but it should not exceed 3m. The pipe fittings should be stacked neatly layer by layer, and should be ensured not to collapse, and easy to take and manage.

③ When the pipes and pipe fittings are temporarily stacked outdoors, there should be a cover.

④ When the pipes are stored, the pipes of different diameters and different wall thicknesses should be stacked separately.

4, handling

① When the pipes are transported, they must be hoisted with non-metallic ropes.

② When the pipes and pipe fittings are transported, they should be handled with care and arranged neatly. Do not throw and drag along the ground.

③ When handling pipes and pipe fittings in cold weather, severe impact is strictly prohibited.

5, transport

① When the vehicle transports the pipes, it should be placed on the bottom of the flat car, and when shipping, it should be placed in a flat cabin. During transportation, the whole length of the straight pipe should be supported, and the coils should be stacked neatly. Straight pipes and coils should be bundled and fixed to avoid colliding with each other, and stacking should not touch the sharp and convex objects that may damage the pipes.

② When the pipe fittings are transported, they should be stacked neatly and firmly in boxes.

③ Pipes and pipe fittings should be covered during transportation to avoid exposure to sun and rain.

PE pipe acceptance, storage, handling and transportation, raw materials and connection technology第2張

ABS (acrylonitrile-butadiene-styrene copolymer)

Unplasticized polyvinyl chloride (UPVC)

CPVC (post-chlorinated polyvinyl chloride)

PP (polypropylene)

PE (polyethylene), also known as LDPE, MDPE and HDPE (low, medium, and high density)

6. Connecting technology

has developed to today, the connection technology of polyethylene has been very mature and reliable. Statistics show that the leakage rate of polyethylene pipe is less than 2/100,000, far lower than 2-3% of ductile iron pipe, AD pipe PE pipe, which greatly improves the safety and economic benefits of the pipeline, which is also a very important reason for the use of polyethylene pipe more gas pipelines.

PE pipe acceptance, storage, handling and transportation, raw materials and connection technology第3張

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Consultation Hotline: 17399989993



主站蜘蛛池模板: 一色屋精品视频在线观看免费| 任你干在线精品视频网2| 蜜臀av人妻国产精品建身房| 人妻中文字幕av无码专区| 最新精品国偷自产在线下载 | 国产精品白浆在线观看免费| 免费国产白丝喷水娇喘视频| 亚洲精品国产自在现线看| 日韩无套无码精品| 国产精品青青草原免费无码 | 一区三区在线专区在线| 国产美女遭强高潮开双腿| 亚洲综合精品成人| 久久久久波多野结衣高潮| 欧美成人亚洲高清在线观看| 草草影院发布页| 日本丰滿岳乱DVD| 欧美另类与牲交zozozo| 99精品国产一区二区电影| 97人人超碰国产精品最新| 亚洲人成电影在线天堂色 | 亚洲r成人av久久人人爽澳门赌| 国产成人精品免费久久久久| 国产人妻人伦精品1国产盗摄| 国产精品久久久久9999爆乳| 无码一卡二卡三卡四卡| 无码一区二区免费波多野播放搜索| 人妻人人澡人人添人人爽| 欧美xxxx做受性欧美88| 麻豆成人精品国产免费| 日韩精品真人荷官无码| 国产成本人片无码免费| 亚洲国产成人久久综合碰| 国产成人精品午夜福利不卡| 成人精品一区二区三区在线观看| 国产午夜福利片在线观看| 97超级碰碰碰久久久久| 丰满的少妇被猛烈进入白浆| 蜜臀视频一区二区在线播放| 校花用?揉我| 日本一区二区a√成人片|