Construction steps and product specifications of PE plum blossom pipe

2025-03-20

PE seven-hole plum blossom pipe is mainly used in underground communication pipe network system. Next, the construction steps and product specifications of the seven-hole plum blossom pipe will be introduced in detail. 1. Execution standard

YD/T841.5 - 2008 "Plastic Pipe for Underground Communication Pipeline" 2. Construction process (1) Preparation before construction

The buried trench of the pipeline should be kept as straight as possible according to the design requirements and in accordance with the construction operation. If the bottom of the trench is not flat, a layer of fine sand can be laid. Be sure to remove the hard objects in the trench before embedding the pipe to prevent the deformation of the pipeline. When starting to bury the pipe, the porous pipe should be reserved for 1-10CM in the human well for subsequent cable threading. It is strictly forbidden for sediment and foreign objects to be mixed into the pipe during the embedding process. ( 2) Laying construction operation

pipe connection: place the pipe-like positioning rib facing up to clean the outer wall of the end pipe. Insert the direct end socket, pad a thick wooden board on the end face, and hit the wooden board with a hammer to make the pipe socket in place. At the direct other end of the receiving port, insert the other pipe and socket it in place, and then extend it to the next manhole. Length adjustment: In actual construction, the length of each pipe after connection is not necessarily the same as the length between the human wells. At this time, it is necessary to accurately measure the length of the pipe according to the actual length of the manhole, and saw it with a hacksaw to ensure that the saw mouth is flat and neat. After the docking is completed, the end that extends into the manhole should be plugged with a pipe plug to prevent foreign matter from invading. ( 3) Backfill soil operation

After the pipe is laid, it should be backfilled with fine sand or fine soil to the height of the buried pipe. Do not let the pipe be in a suspended state, and then backfill other soil. It is forbidden to smash large stones and large dry clods into the pipe. (4) Backfill soil quality requirements

backfill soil shall not contain stones, mud, broken bricks and other debris greater than 100mm. When filling soil, there must be no water in the trench, no backfill mud or corrosive soil is allowed, and there is no spring phenomenon after filling. After laying a PE plum blossom pipe, be sure to use a pre-piercer or a wire as long as the PE plum blossom pipe to pass through it. When the crossing can be completed, then piercing or laying the next pipeline, to avoid wasting manpower and material resources, resulting in repeated construction. (5) Special section of the treatment

When the pipeline passes through the area of serious damage by external force, the joint part is covered with cement concrete to ensure its absolute safety. (6) The connection operation

HDPE special plum blossom pipe joint, which is thin but has good shrinkage. Generally, there is no sealing problem after installation. If there is a sealing requirement, it can be blown with a hot air gun. Since the plum blossom pipe itself contains filling materials that increase hardness and has small shrinkage, the plum blossom pipe joint shrinks, which usually solves the sealing problem. If the sealing requirements are high, you can apply some PE glue to the end of the plum blossom pipe in the core of the joint in advance, and then blow it with a hot air gun after the joint is put on the butt sleeve. (7) Construction tips

When installing and using the plum blossom pipe for the first time, the first section (that is, the distance between two human wells) can be laid without backfilling. Try to pierce or two holes with a cable piercer, and after smooth penetration, proceed to the next section of laying, which will be more secure. Three, product specifications

product specifications outer diameter branch pipe inner diameter error Remarks seven-hole plum blossom pipe 32mm0.5 disc pipe up to 100 meters five-hole large plum blossom pipe 32mm0.5 disc pipe up to 150 meters five-hole plum blossom pipe 28mm0.5 disc pipe up to 200 meters five-hole small plum blossom pipe 26mm0.5 disc pipe up to 200 meters

Hubei AD Building Materials Co., Ltd. as Hubei seven-hole plum blossom pipe manufacturers, specializing in the production of pe seven-hole plum blossom pipe.

Source: Hubei AD Building Materials Co., Ltd., welcome to share! Hotline: 17399989993

Construction steps and product specifications of PE plum blossom pipethe1page


主站蜘蛛池模板: 呦系列视频一区二区三区| 激情综合一区二区三区| 欧洲欧美人成视频在线| 亚洲欧美日韩国产精品专区| 欧美成人精品一区二区综合a片 | 无翼乌工口肉肉无遮挡无码18| 少妇高潮毛片免费看| 果冻传媒剧国产剧情mv在线| 亚洲精品人妻| 99精品丰满人妻无码一区二区| 国产va免费精品观看精品| 国产国拍精品av在线观看| 久久久久久自慰出白浆| 日本最大色倩网站www| 亚洲精品国偷自产在线99人热| 亚洲第一福利网站在线观看 | 久久男人av资源网站| 男人j进入女人j内部免费网站| 特大黑人娇小亚洲女| 国产老妇伦国产熟女老妇视频 | 少妇被c?黄?在线网站| 亚洲综合色成在线播放| 欧美日韩精品成人网站二区| 欧美中文亚洲v在线| 色综合久久久无码网中文| 青青草国产成人久久| 精品国产福利在线视频| 午夜无码片在线观看影院y| 亚洲精品久久久久久动漫| 麻豆网神马久久人鬼片| 伊人大香人妻在线播放| 国产一卡2卡3卡四卡精品网站| 精品97国产免费人成视频| 无码国产一区二区免费| 国产裸体美女视频全黄扒开| 中国精品少妇hd| 国产男女免费完整视频| 国产女人18毛片水真多| 天天爽天天摸天天碰| 亚洲精品不卡无码福利在线观看| 五月激激激综合网亚洲|