色婷婷五月综合亚洲小说-国产精品久aaaaa片-在线亚洲97se亚洲综合在线-欧美三级午夜理伦三级-亚洲超清无码制服丝袜无广告

Detailed explanation of trench excavation width of bellows

2025-04-25

In the construction of pipeline engineering, the determination of the excavation width of the bellows trench is very important, which directly affects the installation quality and subsequent use safety of the pipeline. Generally speaking, the excavation width of the bellows trench can be determined according to the specific conditions of each region, but in order to ensure the normal operation of the construction specification and pipeline, there is a general reference standard, that is, the net width of each side of the pipeline should not be less than 300 mm.

Different specifications of bellows trench excavation width

How wide the trench needs to be dug for the bellows of 600 specifications: For the bellows of 600 specifications, according to the standard of the net width of each side not less than 300 mm, the trench excavation width should be at least 600 (pipe diameter) + 3002 = 1200 mm. However, in actual construction, if there are special geological conditions, other ancillary facilities need to be installed or construction operation space is considered, it may be necessary to widen appropriately.

how wide the trench should be dug for the pre-embedded bellows 300:300 specifications of pre-embedded bellows, the trench excavation width is at least 300 (pipe diameter) + 3002 = 900 mm. Similarly, in complex construction environments, such as rich groundwater and soft soil, it is necessary to increase the width to ensure the stability and construction safety of the trench.

how wide the trench is dug for the 300 bellows: Similar to the pre-embedded 300 bellows, the conventional excavation width is at least 900 mm. However, if it is in a narrow construction area, and the construction technology is mature and the support measures are in place, the width can be appropriately reduced under the premise of meeting the requirements of construction operation and pipeline installation, but it must not be lower than the minimum standard of the specification.

400 sewage bellows need how deep the trench: The buried depth of the sewage bellows is not only related to the pipe diameter, but also affected by factors such as the depth of the frozen soil layer, the ground load, and the connection of the municipal pipe network. Generally in non-frozen soil areas, the top covering depth of the 400 sewage bellows pipe should not be less than 0.7 meters; in frozen soil areas, it needs to be buried below the frozen soil layer. At the same time, it is necessary to ensure a safe distance from other underground pipelines to avoid mutual interference.

bellows grooving allowable deviation and side width

bellows grooving allowable deviation is clearly stipulated in different specifications, usually the bottom of the groove elevation allowable deviation of 20 mm, the bottom of the groove width to meet the above requirements of each side of the net width of not less than 300 mm, and to ensure that the trench straight, the slope on both sides of the design and geological conditions. On the side of the bellows digging how wide, in addition to meeting the net width of 300 mm on each side, if it involves pipeline interface treatment, waterproof measures, etc., also need to increase the width according to the actual process requirements to ensure that the construction operation space is sufficient.

Detailed explanation of trench excavation width of bellows第1張

主站蜘蛛池模板: 欧美日本一区二区视频在线观看| 色偷偷亚洲男人本色| 久久99国产精品尤物| 亚洲 欧洲 日韩 综合在线| 色综合久久综合欧美综合网| 亚洲色成人网站www永久小说| 国产成年码av片在线观看| 自拍偷自拍亚洲精品偷一| 亚洲欧美熟妇综合久久久久| 国产成人无码va在线观看| 久久久久免费精品国产| 天堂av男人在线播放| 日韩a片无码毛片免费看| 亚洲中文字幕无码永久在线| 日本亚洲欧美在线视观看| 午夜性色吃奶添下面69影院| 成人亚洲精品久久久久| 天堂av无码大芭蕉伊人av孕妇| av人摸人人人澡人人超碰| 欧妇女乱妇女乱视频| 动漫av永久无码精品每日更新| 久久久国产精品| 成人区精品一区二区不卡| 成人爽a毛片免费视频| 亚洲综合电影小说图片区| 狠狠久久亚洲欧美专区| 色老99久久精品偷偷鲁| 337p日本大胆欧久久| 一 级 黄 色 片免费网站| 亚洲日本香蕉视频观看视频| 99热都是精品久久久久久| 欧美熟老熟妇色xxxxx| 蜜臀影视| 亚洲 小说区 图片区 都市| 国产精品无码午夜免费影院| 亚洲夜夜性无码| 在线看片人成视频免费无遮挡| 亚洲欧美色国产综合| 成人免费一区二区三区视频软件 | 大地资源中文在线观看官网第二页| 99re8这里有精品热视频|