日韩hdI久操天堂I久草在线费播放视频I依人做aI强开小受嫩苞第一次免费视频I鲁一鲁在线I亚洲淫小说AV在线I绿帽 无套 91 九色 论坛I大香焦超碰I国产96视频I久久免费的精品国产v∧I五月天婷婷综合I可以免费看av的网站I欧洲精品码一区二区三区免费看I日本二三四区I日韩黄色一级电影I99爱精品视频在线观看I特级西西www44高清大胆图片

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipe

2025-03-21

First, the AD brand HDPE double-wall corrugated pipe is strictly prohibited from throwing Zheng, towing and rolling and hitting each other.

pipes should be placed in the shed if they are stored for a long time. When stacked in the open air, they must be covered to prevent sun exposure and keep away from heat sources. Pipe storage time should not be greater than 12 months. Pipes that have exceeded 12 months should be re-tested when used, and those that fail the test should not be used. Pipe stacking height should not be too high to prevent the lower pipes from being compressed and deformed.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe4page

Second, the excavated section of the AD pipeline trench should meet the requirements of

. The original foundation soil at the bottom of the groove should not be disturbed. The bottom of the mechanical excavation groove should be reserved for 200~ 300mm soil layer from manual excavation to the design elevation and leveling; the bottom of the trench is strictly prohibited from being soaked in water or frozen, otherwise the foundation should be strengthened.

Before connecting the pipeline, check whether the rubber ring is well matched and supplied by the pipe manufacturer. The appearance of the selected rubber ring should be flat and smooth, and no defects such as pores, cracks, wrinkles, damage, and heavy skin are allowed.

Confirm that the rubber ring is placed in an accurate position. The correct position of the rubber ring installation should be between the second and third ripples of the interface. The number of rubber rings installed depends on the design requirements. When using two rubber rings, it is recommended that there be a ripple between the two rubber rings. When working on the interface, the inner working surface of the socket and the outer working surface of the socket should be cleaned up first. It is strictly forbidden to have soil and other sundries. Lubricant should be applied to the inner working surface of the socket and the surface of the rubber ring (usually soapy water is enough).

According to the insertion direction as the water flow direction, a wooden baffle can be set at the end of the pipe, and the installed pipe can be slowly inserted into the socket along the aligned axis with a crowbar, and installed one by one. Pipes with a pipe diameter of 400ram can be tied with flexible cables. With manual hoists and other lifting tools, it is strictly forbidden to use construction machinery to forcibly push the top pipe into the socket. After the installation is completed, check whether the key socket is inserted in place.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe2page

the foundation of the inspection well should be built on the original soil, when the original soil foundation is soft or disturbed, the foundation treatment should be carried out according to the design and specification requirements; the concrete foundation of the inspection well should be poured with the pipeline foundation colleagues to prevent uneven settlement of the pipeline and the inspection well; the block should be fully wet before the inspection well masonry, and the cement mortar base of the HDPE double-wall corrugated pipe should be full and dense during masonry.

inspection well masonry, masonry cement mortar strength should meet the design requirements, the slurry should be full, mortar and block around the adhesion should be close, no slurry leakage, the upper and lower blocks should be staggered masonry; support, connected pipe access inspection well room, should be installed in the well room construction at the same time reserved support, connected pipe, reserved pipe diameter, direction, elevation should meet the design and specification requirements, pipe and well wall connection should be tight; inspection well reserved pipe mouth should be used low-strength mortar masonry seal smooth; well wall plastering surface should be dense and flat, strictly prohibited hollow drum, cracks and other phenomena.

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe3page

4, closed water test pass

pipeline construction end should be timely closed water test. Before the water closure test, the appearance quality of the pipeline and inspection well should be accepted and qualified, and the pipeline has not been backfilled, and there is no water accumulation in the trench. All reserved holes should be plugged and no water seepage should be allowed.

When the upstream design water head of the test section should not exceed the inner wall of the pipe top during the water closure test of the pipeline, the test water head should be measured by adding 2m to the inner wall of the upstream pipe top. When the upstream design water head of the test section exceeds the inner wall of the pipe top, the test water head should be measured by adding 2m to the upstream design water head of the test section. The test water head at the calculation is less than 10m, but when it has exceeded the wellhead of the upstream inspection well, the test water head should be based on the height of the upstream inspection wellhead.

When the pipeline is closed for water testing, an appearance inspection should be carried out to strictly prohibit water leakage. When the water head reaches the required height, check the brick plugging, pipe body, and well body for water leakage. If there is serious leakage, it should be plugged. After soaking for 24h, observe the water seepage again. The measurement time of the water seepage should not be less than 30min. Correctly calculate the water seepage. The measured water seepage should be less than or equal to the allowable water seepage specified in the "Water Supply and Drainage Pipeline Construction and Acceptance Code" (GB50268-2008).

5, backfill quality control pass

pipeline closed water test, should be backfilled in time, backfill should check the pipeline before damage or deformation, damaged pipeline should be repaired or replaced; pipeline groove backfill when the groove must not have bricks, stones, wood and other debris, the groove is strictly prohibited from water, is strictly prohibited with water backfill.

The soil quality of the backfill should meet the design and specification requirements. Within the range of 500ram from the bottom of the tank to the top of the pipe, the backfill must not contain organic matter, frozen soil, and debris such as broken bricks, stones, and concrete fragments greater than 50ram. The water content of the backfill should be controlled within the range of 2% of the optimum moisture content according to the soil type and the compaction tools used. The effective support angle range of the pipeline should be filled with medium coarse sand and dense, in close contact with the pipe wall, and cannot be filled with soil or other materials.

The backfill materials on both sides of the pipeline and within the 500mm range above the top of the pipe should be transported symmetrically from both sides of the groove. It is strictly forbidden to backfill directly on the pipeline. When backfilling other parts, they should be evenly transported into the groove. It is strictly forbidden to push in centrally; when backfilling below the pipe radius, measures should be taken to prevent the pipeline from floating and displacing; when backfilling the pipeline, it should be layered symmetrically backfilled from both sides of the pipeline and tamped at the same time. The virtual floor thickness of each layer of backfill soil should be carried out according to the "Code for Construction and Acceptance of Water Supply and Drainage Pipeline Engineering" (GB50236-2008).

How to Achieve Effective Construction of HDPE Double Wall Corrugated Pipethe4page

4 Source: Hubei AD Building Materials Co., Ltd., welcome to share! If you have AD pipe procurement needs, you can contact us.


主站蜘蛛池模板: 天堂网www在线资源中文| 久久国产超碰女女av| 蜜桃av少妇久久久久久高潮不断| 欧美精品色婷婷五月综合| 国产成人高清精品免费软件| 国产乱妇无码大片在线观看| 无码大潮喷水在线观看| 欧美制服丝袜人妻另类| 久爱无码免费视频在线| 无码h黄肉3d动漫在线观看| 国产亚洲精品自在久久| 玩成熟老熟女视频| 97人人模人人爽人人喊电影| 人妻蜜桃久久AV一区| 精品国产av一二三四区| 国产av综合第一页| 久久中文字幕无码中文字幕有码| 国产成人理论无码电影网| 性欧美丰满熟妇xxxx性久久久| 欧洲性久久精品| 麻豆tv入口在线看| 日本免费一区二区三区视频观看 | 久久99热人妻偷产国产| 国产成人一区二区三区在线观看| 欧美人禽杂交狂配| 国产午夜福利精品久久2021| 久久精品成人一区二区三区| 天天操夜夜操| 国产亚洲无线码一区二区| 亚洲精品伦理熟女国产一区二区| 欧美熟妇性xxxx欧美熟人多毛| 无码人妻熟妇av又粗又大| 国产黄在线观看免费观看软件| 深夜福利小视频在线观看| 日本成熟少妇激情视频免费看| 99re8这里有精品热视频| 亚洲精品乱码久久久久66| 色欲人妻aaaaaa无码| 狠狠久久永久免费观看| 最新国产精品剧情在线ss| 国产碰在79香蕉人人澡人人看喊|